Lion One Drills Exceptional High-Grade Intersections as Part of Metallurgical Drill Program


InvestorSarfari Comments:

Lion One keeps on proving it has the goods. The drilling continues and the results sparkle. In other words, the company is not broken…. but the stock is.

It seems that the last Bought Deal Financing is still weighing down Lion One shares. Gold and other metals have had an impressive 48 hours with amazing gains from their lows. We are VERY curious to see how Mr. W. Berukoff will proceed in bringing back the share price to the all-time highs of yester-months.

After all, the job of a leader of a public company is to enhance the value of the shares - is it not?



North Vancouver, B.C., October 4, 2022 - Lion One Metals Limited (TSX-V: LIO) (OTCQX: LOMLF) (ASX: LLO) (“Lion One” or the “Company”) is pleased to announce assay results from recent wide-diameter (PQ) core drilled for metallurgical test work at its Tuvatu Gold Project in Fiji.

These results complement the excellent results obtained by the infill drill program completed earlier this year and reported on February 23, 2022 (Lion One Reports Additional High Grade Intercepts, Completes Phase 1 Infill Drill Program at Tuvatu – Lion One Metals). The additional results provided by the metallurgical drill program reported here will be applied to the ongoing remodelling of the Tuvatu orebody that will inform the resource update scheduled for Q1 2023. Results of the metallurgical study that will be based on the material provided by this drilling program will be reported as they are received.


Highlight intercepts include:
TUDDM-001 intersecting the URW1 mineralized vein:

  • 14.96 g/t Au over 24.0m from 81.8-105.8m including:

    • 105.19 g/t Au over 0.3m from 86.9-87.2m

    • 18.67 g/t Au over 0.6m from 91.4-92.0m

    • 19.43 g/t Au over 0.6m from 93.2-93.8m

    • 26.59 g/t Au over 0.9m from 95.6-96.5m

    • 14.80 g/t Au over 0.6m from 96.5-97.1m

    • 23.43 g/t Au over 0.6m from 97.1-97.7m

    • 13.63 g/t Au over 0.6m from 97.7-98.3m

    • 33.76 g/t Au over 0.6m from 98.3-98.9m

    • 22.36 g/t Au over 0.6m from 98.9-99.5m

    • 6.04 g/t Au over 0.9m from 99.5-100.4m

    • 78.64 g/t Au over 2.4m from 103.4-105.8m which includes:

    • 9.44 g/t Au over 0.6m from 104.6-105.2m

    • 297.70 g/t Au over 0.6m from 105.2-105.8m

TUDDM-003 intersecting the URW1 mineralized vein:

  • 65.13 g/t Au over 3.2m from 78.8-82.0m including:

    • 98.88 g/t Au over 2.1m from 78.8-80.9m which includes:

    • 58.18 g/t Au over 0.3m from 78.8-79.1m

    • 624.81 g/t Au over 0.3m from 79.1-79.4m

  • 23.27 g/t Au over 3.3m from 118.9-122.2m including

    • 50.67 g/t Au over 1.5m from 118.9-120.4m which includes:

    • 19.49 g/t Au over 0.9m from 118.9-119.8m

    • 97.45 g/t Au over 0.6m from 119.8-120.4m

TUDDM-004 intersecting the SKL and URW1mineralized veins:

  • 260.44 g/t Au over 0.3m from 55.7-56.0m

  • 213.52 g/t Au over 0.9m from 56.6-57.5m

  • 40.08 g/t Au over 0.9m from 78.2-79.1m

  • 10.03 g/t Au over 3.0m from 130.6-133.6m including:

    • 59.82 g/t Au over 0.3m from 130.6-130.9m

    • 11.39 g/t Au over 0.3m from 130.9-131.2m

    • 13.64 g/t Au over 0.3m from 131.2-131.5m

TUDDM-005 intersecting the Murau (M) mineralized vein:

  • 9.30 g/t Au over 5.4m from 127.7-133.1m including:

    • 31.56 g/t Au over 0.6m from 128.9-129.5m

    • 14.99 g/t Au over 1.2m from 129.5-130.7m

    • 6.08 g/t Au over 0.9m from 132.2-133.1m

  • 22.80g/t Au over 1.5m from 140.3-141.8m including:

    • 9.55 g/t Au over 0.3m from 140.6-140.9m

    • 10.54 g/t Au over 0.3m from 140.9-141.2m

    • 58.59 g/t Au over 0.3m from 141.2-141.5m

    • 32.03 g/t Au over 0.3m from 141.5-141.8m

TUDDM-006 intersecting the Murau (M) Lodes

  • 9.87g/t Au over 3.9m from 141.8-145.7m including:

    • 10.01g/t Au over 1.2m from 141.8-143.0m

    • 13.74g/t Au over 0.6m from 143.3-143.9m

    • 13.49g/t Au over 1.2m from 144.5-145.7m

All six metallurgical drill holes were drilled from surface using wide diameter PQ core (85mm) between June 6 and August 10, 2022. The purpose of the program was to collect samples from areas scheduled for mining in the first 3 years of development. These assays presented are a result of one eighth split core, with the remaining seven eighths being sent to Bureau Veritas metallurgical laboratory in Vancouver, Canada for test work to assist in the design of optimised recoveries. As this is a metallurgical program, the holes were designed to intersect some vein sets at an oblique angle in-order to maximise mineralized sample recovery and as such, while drill widths does not necessarily represent true widths, the results provide information on the continuity of Au grades. The URW1 lode is interpreted to strike north-south and dip steeply east and has a true width of approximately 1 to 7 metres. The Murau lodes are interpreted to strike east-west with a moderate southerly dip with multiple lodes of true-width between 0.3 and 4 metres. The SKL lodes are dip subhorizontally, with true-widths of between 0.3 and 1 metre.

Lion One CEO Walter Berukoff commented “these latest results underscore the continuous, high-grade nature of the mineralization at Tuvatu. Each batch of drill results adds enormous value to the project in both addition of ounces to the total metal budget as well as clarification of important upside potential."

Figure 1. Image from Leapfrog software long-section view west showing select results from metallurgical drilling campaign. The Murau (red) and SKL lode (purple) orientations are projected on to section.

Figure 2. Image from Leapfrog software plan view showing select results from metallurgical drilling campaign. The general outline of the Murau (red) and SKL lode (purple) is projected onto the plan



Table 1: Drilling intervals returning >0.5 g/t Au. Intervals > 3.0 g/t Au cutoff are shown in red, and intervals > 9.0 g/t Au or longer than 1.2m are bolded.


HOLEID

FROM (M)

TO (M)

INTERVAL

METRES

LODE

TUDDM-001

62.0

62.9

0.9

0.58

SKLW7

TUDDM-001

70.4

71.3

0.9

0.78

SKLW8

TUDDM-001

76.4

77.3

0.9

1.04

Undefined

TUDDM-001

79.4

80.6

1.2

1.56

SKLW12

TUDDM-001

81.8

105.8

24.0

14.96

URW1

Incl.

86.9

87.2

0.3

105.19

URW1

Incl.

91.4

92.0

0.6

18.67

URW1

Incl.

93.2

93.8

0.6

19.43

URW1

Incl.

95.6

96.5

0.9

26.59

URW1

Incl.

96.5

97.1

0.6

14.80

URW1

Incl.

97.1

97.7

0.6

23.43

URW1

Incl.

97.7

98.3

0.6

13.63

URW1

Incl.

98.3

98.9

0.6

33.76

URW1

Incl.

98.9

99.5

0.6

22.36

URW1

Incl.

99.5

100.4

0.9

6.04

URW1

Incl.

103.4

105.8

2.4

78.64

URW1

Which Incl.

104.6

105.2

0.6

9.44

URW1

and incl.

105.2

105.8

0.6

297.70

URW1

TUDDM-001

107.3

112.4

5.1

4.40

URW1

Incl.

107.3

107.9

0.6

17.00

URW1

Incl.

107.9

108.5

0.6

5.63

URW1

TUDDM-001

122.9

123.8

0.9

6.07

M7

Incl.

122.9

123.5

0.6

6.12

M7

Incl.

123.5

123.8

0.3

5.96

M7

TUDDM-002

11.5

19.4

7.9

0.93

ME1

TUDDM-002

23.0

23.3

0.3

2.93

ME1

TUDDM-002

24.8

26.6

1.8

1.31

ME1

TUDDM-002

28.7

29.0

0.3

1.11

ME1

TUDDM-002

30.8

36.2

5.4

3.29

SKLW6

Incl.

33.2

33.5

0.3

19.60

SKLW6

Incl.

33.5

34.1

0.6

6.03

SKLW6

TUDDM-002

40.1

41.0

0.9

1.45

SKLW7

TUDDM-002

47.6

48.2

0.6

1.55

SKLW8

TUDDM-002

51.2

51.5

0.3

14.26

SKLW9

TUDDM-002

55.1

55.7

0.6

0.84

SKLW9

TUDDM-002

59.0

59.6

0.6

3.71

SKLW9

Incl.

59.3

59.6

0.3

5.15

SKLW9

TUDDM-002

61.1

61.7

0.6

0.89

SKLW9

TUDDM-002

64.7

72.6

7.9

2.39

URW1

Incl.

65.6

66.2

0.6

6.76

URW1

Incl.

67.7

68.0

0.3

5.81

URW1

Incl.

69.8

70.1

0.3

5.14

URW1

TUDDM-002

75.3

75.6

0.3

1.66

M8

TUDDM-002

78.9

81.5

2.6

4.83

M8

Incl.

79.7

80.3

0.6

6.75

M8

Incl.

80.3

80.9

0.6

6.71

M8

TUDDM-002

84.2

86.3

2.1

4.24

M8

Incl.

84.2

84.5

0.3

11.91

M8

Incl.

84.5

84.8

0.3

7.41

M8

Incl.

84.8

85.1

0.3

5.17

M8

TUDDM-002

97.8

98.4

0.6

0.81

M9

TUDDM-002

101.1

101.7

0.6

1.71

M9

TUDDM-003

8.6

10.4

1.8

2.52

Undefined

Incl.

9.5

9.8

0.3

6.76

Undefined

TUDDM-003

12.2

13.1

0.9

0.73

Undefined

TUDDM-003

14.3

16.1

1.8

0.64

Undefined

TUDDM-003

17.6

17.9

0.3

0.82

Undefined

TUDDM-003

19.4

20.0

0.6

0.69

Undefined

TUDDM-003

23.6

23.9

0.3

1.43

Undefined

TUDDM-003

26.3

35.9

9.6

2.47

ME1

Incl.

31.7

32.0

0.3

6.79

ME1

Incl.

34.1

34.4

0.3

45.68

ME1

TUDDM-003

37.1

42.3

5.2

0.61

SKLW6

TUDDM-003

45.6

47.1

1.5

0.89

SKLW8

TUDDM-003

49.1

49.7

0.6

2.34

SKLW8

TUDDM-003

50.9

55.1

4.2

2.84

SKLW9

Incl.

51.5

51.8

0.3

5.16

SKLW9

Incl.

54.2

54.5

0.3

7.39

SKLW9

TUDDM-003

65.9

67.4

1.5

0.65

SKLW9

TUDDM-003

71.0

73.4

2.4

9.74

URW1

Incl.

71.6

72.2

0.6

5.00

URW1

Incl.

72.2

72.8

0.6

14.41

URW1

Incl.

72.8

73.4

0.6

16.77

URW1

TUDDM-003

78.8

82.0

3.2

65.13

URW1

Which Incl.

78.8

80.9

2.1

98.88

URW1

Incl.

78.8

79.1

0.3

58.18

URW1

Incl.

79.1

79.4

0.3

624.81

URW1

Incl.

79.4

79.7

0.3

6.20

URW1

TUDDM-003

91.9

93.1

1.2

1.00

URW1

TUDDM-003

95.2

98.9

3.7

4.89

M4

Incl.

95.2

95.8

0.6

12.44

M4

Incl.

97.6

97.9

0.3

18.60

M4

TUDDM-003

101.0

106.4

5.4

4.17

M5

Incl.

101.0

102.2

1.2

9.01

M5

Incl.

103.1

103.7

0.6

10.33

M5

Incl.

103.7

104.3

0.6

5.52

M5

TUDDM-003

118.9

122.2

3.3

23.29

M7

Which Incl.

118.9

120.4

1.5

50.67

M7

Incl.

118.9

119.8

0.9

19.49

M7

Incl.

119.8

120.4

0.6

97.45

M7

TUDDM-003

132.1

133.3

1.2

1.13

M7

TUDDM-004

8.6

8.9

0.3

1.22

M7

TUDDM-004

10.1

10.7

0.6

0.71

M7

TUDDM-004

12.5

16.7

4.2

0.42

M7

TUDDM-004

17.9

18.2

0.3

2.19

M7

TUDDM-004

19.4

22.1

2.7

1.85

M7

Incl.

19.7

20.0

0.3

6.95

M7

TUDDM-004

23.3

23.9

0.6

0.99

M7

TUDDM-004

26

29.6

3.6

0.78

ME1

TUDDM-004

31.1

36.8

5.7

1.11

ME1

TUDDM-004

38.6

39.8

1.2

0.77

Undefined

TUDDM-004

43.4

44.0

0.6

0.56

SKLW6

TUDDM-004

55.7

56.0

0.3

260.44

SKLW8

TUDDM-004

56.6

57.5

0.9

213.52

SKLW8

TUDDM-004

64.7

68.6

3.9

0.85

Undefined

TUDDM-004

78.2

79.1

0.9

40.08

SKLW10

TUDDM-004

83.0

83.9

0.9

1.40

Undefined

TUDDM-004

85.7

86.9

1.2

21.10

SKLW11

Incl.

86

86.9

0.9

26.72

SKLW11

TUDDM-004

89.6

92.3

2.7

3.13

Undefined SKL

Incl.

91.7

92.0

0.3

10.05

Undefined SKL

Incl.

92.0

92.3

0.3

11.03

Undefined SKL

TUDDM-004

95.9

101.2

5.3

4.13

Undefined SKL

Incl.

96.4

97.0

0.6

9.28

Undefined SKL

Incl.

97.0

97.6

0.6

6.87

Undefined SKL

Incl.

100.6

101.2

0.6

7.30

Undefined SKL

TUDDM-004

112.9

114.4

1.5

14.14

Undefined SKL

Incl.

112.9

113.2

0.3

22.61

Undefined SKL

Incl.

113.2

113.5

0.3

11.88

Undefined SKL

Incl.

113.5

114.4

0.9

12.07

Undefined SKL

TUDDM-004

116.2

117.4

1.2

0.95

Undefined SKL

TUDDM-004

121.6

122.5

0.9

4.02

Undefined SKL

TUDDM-004

124.9

125.5

0.6

6.02

URW1

Incl.

125.2

125.5

0.3

11.51

URW1

TUDDM-004

128.5

129.1

0.6

1.09

URW1

TUDDM-004

130.6

133.6

3.0

10.03

URW1

Incl.

130.6

130.9

0.3

59.82

URW1

Incl.

130.9

131.2

0.3

11.39

URW1

Incl.

131.2

131.5

0.3

13.64

URW1

TUDDM-004

136.3

136.9

0.6

2.80

URW1

TUDDM-004

153.0

153.6

0.6

9.79

URW1

TUDDM-005

74.3

79.7

5.4

1.69

M1

Incl.

77.3

77.6

0.3

11.66

M1

TUDDM-005

80.9

83.0

2.1

5.89

M2

TUDDM-005

85.7

86.9

1.2

1.85

M3

TUDDM-005

105.5

106.4

0.9

8.84

M4

TUDDM-005

123.8

126.5

2.7

10.98

M8

Incl.

124.4

124.7

0.3

8.51

M8

Incl.

125.9

126.2

0.3

64.21

M8

Incl.

126.2

126.5

0.3

18.15

M8

TUDDM-005

127.7

133.1

5.4

9.30

M8

Incl.

128.9

129.5

0.6

31.56

M8

Incl.

129.5

130.7

1.2

14.99

M8

Incl.

132.2

133.1

0.9

6.08

M8

TUDDM-005

136.7

139.1

2.4

11.50

M9

Incl.

138.2

138.5

0.3

50.06

M9

Incl.

138.5

138.8

0.3

16.66

M9

Incl.

138.8

139.1

0.3

10.14

M9

TUDDM-005

140.3

141.8

1.5

22.80

M10

Incl.

140.6

140.9

0.3

9.55

M10

Incl.

140.9

141.2

0.3

10.54

M10

Incl.

141.2

141.5

0.3

58.59

M10

Incl.

141.5

141.8

0.3

32.03

M10

TUDDM-006

56.3

56.6

0.3

0.53

M10

TUDDM-006

93.2

95.6

2.4

4.20

M3

Incl.

94.4

95.6

1.2

6.30

M3

TUDDM-006

98.9

99.5

0.6

9.06

M4

Incl.

99.2

99.5

0.3

15.96

M4

TUDDM-006

113.9

114.8

0.9

3.39

M5

TUDDM-006

136.7

138.5

1.8

3.64

M8

Incl.

137.3

138.5

1.2

5.12

M8

TUDDM-006

141.8

145.7

3.9

9.87

M9

Incl.

141.8

143.0

1.2

10.01

M9

Incl.

143.3

143.9

0.6

13.74

M9

Incl.

144.5

145.7

1.2

13.49

M9


Table 2: Survey details of diamond drill holes referenced in this release

Hole No Coordinates (Fiji map grid) RL final depth dip azimuth
E N m (TN)
TUDDM-001 1876337 3920739 227.2 151.4 -90
TUDDM-002 1876348 3920796 209.5 112.4 -76 219
TUDDM-003 1876350 3920793 206.7 159.4 -59 197
TUDDM-004 1876352 3920798 209.7 154.2 -59 180
TUDDM-005 1876335 3920737 227.3 173.6 -69 304
TUDDM-006 1876335 3920738 227.2 180.1 -59 302

For original news release: https://liononemetals.com/2022/10/lion-one-drills-exceptional-high-grade-intersections-as-part-of-metallurgical-drill-program/

Previous
Previous

Lion One Intersects 17.52 G/T Gold Over 23.7m In Deep Zone 500 Drilling At Tuvatu Alkaline Gold Project In Fiji

Next
Next

Lion One Extends the URW3 Lode, a Key Component of The 500 Zone Feeder, with Several Bonanza-Grade Drill Intercepts at Its Tuvatu Gold Mine, Fiji